RESIDENTIAL: BUILDING PROJECT
Renovation Addition in Gleneden
Project was completed in approximately 10 months. The property was designed and built with a “Hacienda Style” theme and finishes selected to enhance the chosen style throughout. Walls were finished with a textured faux finish. Flooring is ceramic tile with in-floor heating. Lightweight concrete tile was used for roofing.